public void ScheduleDependentTasks(
TreeListNode node
)
#Parameters
Name | Type | Description |
---|---|---|
node | Tree |
A Gantt task whose dependant tasks should be re-scheduled. |
#Remarks
The GanttControl recalculates related task positions and updates the summary task positions, durations, and progress when you change a task’s start date, progress, or duration.
This functionality is available via the following API:
Member | Description |
---|---|
Allow |
If enabled, the control re-schedules tasks after each change. |
Gantt |
A schedule mode (Forward or Backward) that specifies how the Gantt |
Schedule |
Call these methods to re-schedule tasks on demand if the previous option is disabled. |
Schedule |
Call this method to re-schedule all the Gantt tasks. |
Tasks |
This event allows you to rollback changes if they create invalid links. |